oem portable quick assembly container house roof blue cabin
oem portable quick assembly container house roof blue cabin
Flat Pack Container House

Flat Pack Container House Factory Direct Quick Assembly

A 20ft flat pack module breaks into about seventeen quoted lines, from frame and panels through to packing and freight. Two offers that differ by eight percent usually differ on three of those lines, and the gap hides in skin thickness, wool density and the floor board.

product specifications Fully customizable
material Galvanized steel, 304 stainless steel
filling material rock wool, EPS and polyurethane
Service temperature range -30°C to +70°C
Customization wall panels, floor panels, power sockets, furniture, water inlets, kitchen cabinets, sanitary ware and so on
Factory location GUANGZHOU
Supported shipping terms EXW,FCA,FOB,CIF,DDP
Payment terms T/T, L/C, other terms negotiable
  • Share:

Product description

Module Size, Weight and Road Fit

What reaches site is a flat pack container house stacked in flat sections, not a closed box. Each module sits on the usual twenty foot footprint, so it fits a standard truck bed and a sea container. One finished unit weighs about 1.5 t and a small forklift moves it. Wall, roof and floor parts travel apart. Loose, they weigh far less than the assembled room.

Cost lineWhat it coversWhat pushes it up
Steel framePosts, beams, crossmembers, castingsSpan and post section set the steel tonnage
PanelsSkins, core, lamination75 mm core, PU instead of wool
FloorMGO board and wear layerA printed wear layer costs more than a plain one
OpeningsDoor, windows, hardwareDouble glazing and extra windows lift the glazing bill
ElectricsBreaker, sockets, lights, wiringSplit circuits, 110 V, data cabling
Roof buildTile, wool, ceiling board75 mm panel with standing seam
LabourCutting, welding, coatingSmall batches and odd sizes slow the welding line
CoatingGalvanizing plus powder coatTwo tone paint and non standard shades add a pass
Fit-outPartition, pod, kitchenetteA plumbed pod costs more than a dry partition
PackingCradle, film, corner guardsA crate per unit is needed on rough routes
Inland transportFactory to portDistance to port and traffic at the gate
Ocean freightPer container, all six unitsRoute, season and fuel surcharge move the rate
Duty and clearanceHS 9406.90 prefabricated buildingsLocal tariff code and broker charges apply
Site worksBlocks, slab, steps, drainageSoft ground or a slope needs more blocks
CraneTwo lifts per unitLong reach or no local crane adds a hire day
Site labour8 to 12 hours per moduleA first unit with no supervisor takes longer
After-salesSpares, video, warrantyRemote sites with no agent need more spares

Galvanized Frame, Bolted Corners and Posts

The frame is welded from 1.2 mm galvanized square tube. Corner posts pass the roof load down to four steel castings, and cross beams run along the top and bottom of each long side. Sections bolt together on site, so joints need no welding and no hot work permit. Punched holes hold the modules square through the first lift.

Frame parts in the crate
· 1.2 mm galvanized square tube posts and beams
· Four corner castings drilled for anchor bolts
· Punched splice plates with galvanized bolts
· Diagonal braces for both long walls
· Touch up paint for scratched joints

Sandwich Panels, Roof Sheets and Sealing

Walls take 75 mm sandwich panels with a 0.23 mm colour steel face, and the same build covers the roof over purlins. Ridge caps get locked after that. Each panel weighs about 40 kg, so two people stand one upright without a hoist. Joints are closed with foil tape and a bead of silicone. Floors are 15 mm cement board over a steel frame.

Panel and roof kit
· 75 mm wall panels with colour steel on both faces
· Roof panels with ridge and barge trims
· 15 mm cement floor boards, cut to size
· Foil tape, silicone cartridges and closure strips
· Screws, washers and rivets in labelled bags

Steel Door, Sliding Windows and Wet Room

Entry is a steel door in a reinforced frame, with a lock and three hinges. Windows slide in plastic steel frames and carry a fly screen. Both openings are cut into the panels at the plant, and that keeps each opening square. A wet room pod carries the sanitary ware. Inside sit a basin, a mirror, a toilet and a shower tray, sealed to the floor and walls on site.

Openings and wet room
· Steel entrance door with lock and handle
· Sliding windows with screens and drip caps
· Bathroom pod with basin, mirror and toilet
· Shower tray, waste pipe and floor drain
· Silicone and edge trim to seal the pod

Room Plans, Cladding and Small Crew Assembly

Room plans inside a flat pack container house run from one open space to two bedrooms with a short corridor. Partitions are cut to the drawing and shipped with the panels. Outside, the finish can take a wood grain print, a plain colour or a two tone scheme. Doors and windows can shift along a wall before the frame is welded, and a canopy or a small porch fits the same module. The shell does not change.

Options fixed at order
· Wood grain or plain colour steel finish
· Partition sets for one or two bedrooms
· Extra window in place of a wall panel
· Canopy frame and roof over the door
· Kitchenette unit with a sink and tap

With a crew of four, a quick assembly container house closes in about 12 h across a working day. The crate comes open and the floor frame goes onto blocks, then gets checked for level. Posts go up, then the roof frame, then the panels. Bolts are drawn down from the middle outwards. Sealing and supply come last.

Packing, Steel Bundles and Sea Loading

Flat sections stack in a steel cradle and are bound with strap. Corner guards protect the panel edges, and film keeps road spray off the paint. One forty foot high cube holds a full set of modules, and that cuts the freight per unit. Each bundle carries a packing list taped to the frame. A forklift is needed at both ends.

What travels with the house
· Packing list and marked bundle numbers
· Assembly drawing with bolt sizes
· Wiring diagram and inlet position
· Spare bolts, screws and tape
· Touch up paint and spare sealant

Sites That Suit a Flat Pack Unit

Site offices, canteens, guard rooms and staff sleeping quarters all use the same flat pack container house. A clinic or a small shop needs only a different partition set. Because every part arrives flat, a remote plot without a crane can still take the unit. It lifts again. A second site takes it without new parts.

Workshop Production Flow

Factory Introduction

Expandable House Manufacturing Factory

We are a professional manufacturer specializing in prefabricated container houses, expandable container houses, foldable container houses and mobile prefab bathrooms. We design, produce and export modular housing solutions for hotels, villas, offices, dormitories, warehouses, workshops and construction sites. Our factory covers an area of 50,000 square meters and is located in Guangzhou. Visitors are welcome.

FAQ

  • What does the flat pack contain?

    A flat pack container house is stacked in flat sections, not a closed box. Each module sits on the usual twenty foot footprint.
  • How is the frame built?

    The frame is welded from 1.2 mm galvanized square tube. Corner posts pass the roof load down to four steel castings, and cross beams run along the roof.
  • What thickness are the panels?

    Walls take 75 mm sandwich panels with a 0.23 mm colour steel face, and the same build covers the roof over purlins. Ridge caps lock after the sheets land.
  • Is the wiring ready?

    Wiring runs inside the wall panels before they leave the plant. Sockets, switches and ceiling lights are fitted and tested at the factory.
  • Will assembly finish in a day?

    With a crew of four, a quick assembly container house closes in about 12 hours across a working day. The crate comes open and the floor frame goes down first.

Download

WhatsApp

Leave a message!

Leave a message!