export portable folding container house z type open panel crane
export portable folding container house z type open panel crane
Z型折りたたみ式コンテナハウス

折りたたみ式コンテナハウス卸売 Z型 簡単設置

Fourteen steps, two people, one forklift and a bucket of hand tools. The shell goes up in about 40 minutes and the unit is ready for connection in two hours, with no welding on site and no trade needed except an electrician for the last 45 minutes.

製品仕様 20フィート
材料 亜鉛メッキ鋼、304ステンレス鋼
充填材 ロックウール、EPS、ポリウレタン
使用温度範囲 -30℃~+70℃
カスタマイズ 壁パネル、床パネル、電源コンセント、家具、給水口、キッチンキャビネット、衛生陶器など
工場所在地 広州
対応配送条件 EXW、FCA、FOB、CIF、DDP
支払い条件 T/T、L/C、その他の条件は交渉可能
  • 共有:

製品説明

Folded Depth, Open Size and Unit Mass

The z type folding container house travels flat and opens into a room 5.8 m by 2.5 m. Closed, the pack stands 2.5 m high and 2.5 m wide. At 1,100 kg a forklift lifts it. A pad of 15 m by 12 m gives room to work around the pack. At 1,100 kg a forklift lifts the pack clear of the truck, and a pad of 15 m by 12 m gives room to work around it. Closed, the pack stands 2.5 m high and 2.5 m wide, small enough to thread through a standard gate.

TaskWhat you need in your handPeopleMinutes
Set the pack on padsForklift, 4 pads, 2 m level215
Check the squareTape measure, 5.8 m diagonals15
Cut the bandingSide cutters, gloves23
Lift the roof frameTwo 1.8 m pinch bars34
Stand wall oneRubber mallet, 2 drift pins36
Stand wall twoRubber mallet, 2 drift pins36
Drive the corner pinsBrass drift, 500 g hammer24
Close the roof cams13 mm socket or lever bar25
Seat the end panelsSuction cup, 2 people28
Hang the doorSpirit level, 2 wedges210
Set the windowsNumber 2 square driver210
Seal the cornersSealant gun, neutral silicone120
Pull the supply cableCable, gland, 2.5 mm² tails1 electrician30
Test the circuitsSocket tester, insulation tester1 electrician15
Fit the downpipeHacksaw, 2 brackets110
Touch up scratchesTouch-up paint, brush110
Walk the checklistHandover sheet, pen215
Installation video

Frame Tube, Sill Grid and Panel Core

Square tube with a 2.5 mm wall runs the top rail, the sill and the corner posts. Each top edge takes a run of five tubes, and nine more cross the sill under the floor deck from side to side. Posts sit about 2 m apart on the long wall, which keeps the span short. Black paint goes on last.

Frame and sill schedule
· 2.5 mm square tube along the top rail
· Nine tubes crossing the sill under the deck
· Corner post with a welded base plate
· Hinge pin, brass drift and locking cam
· Black topcoat over a ground coat

The z type folding container house takes a colour steel skin over an EPS core, bonded under pressure. Roof covering is a tile profile sheet laid on purlins, with a ridge cap at the join. Underfoot, a board panel carries a wear layer. Those layers slow heat gain and keep the inside dry in steady rain.

Panel and floor build
· Colour steel skin over an EPS core
· Profiled roof tile with a ridge cap
· Board floor panel under a wear layer
· Stepped groove at every wall joint
· Foil tape roll packed with the panels

Wiring Route, Breakers and Wet Room Door

The wiring loom is pulled through the frame before the panels close, so no conduit shows on a finished wall. Beside the door, a distribution box splits breakers for light and power. Lamps, switches and the AC point arrive fitted. Power comes in on a CEE industrial plug from the site supply.

Electrical parts in the crate
· Distribution box with light and power breakers
· Ceiling lamp, wall switch and air conditioning point
· CEE industrial plug with a matching socket
· Wiring loom cut to the outlet schedule
· Wiring diagram folded into the document wallet

Entrance closes on a steel leaf with a lock bar, hung in a welded frame. Window sashes slide, screened and drained. Inside, the wet room holds a shower tray, a pan, a basin and a mirror on one sealed base. Lining goes behind the shower before packing.

Door, window and wet room
· Steel entry door with a lock bar
· Plastic steel slider with a fly screen
· Window roller, drain cover and gasket roll
· Shower tray with a sealed upstand
· Pan, basin and framed mirror
· Waterproof membrane behind the lining

Room Plans, Paint and the One Hour Opening

Room plans for a z type folding container house run from one open bay to two bedrooms on the same shell. Colour and openings settle on the order sheet. Exterior wall material and window position get fixed before steel is cut, not on site. Wood grain film gives a warm face, and plain paint suits an office. A canopy or a small porch hangs on the same frame.

Exterior and layout choices
· Wood grain film or plain paint
· Partition set for a second bedroom
・ツートンカラーオプション付きカラーカード
· Canopy bracket and fixing bolts
· Door and window position sheet

An easy install container house opens in about an hour with four workers, a 13 mm socket and a rubber mallet. Walls swing up on the hinge line and lock at the corner posts before the roof goes on. Pins go in with a drift. Roof cams close, and no welding, cutting or wet trade happens on site.

Tools for the pad
· 13 mm socket on a ratchet handle
· Brass drift and a rubber mallet
· Spirit level and a length of hose
· Banding cutter and a retractable knife

Site Offices, Canteens and Farm Rooms

Site offices, canteens, guard rooms and farm housing use the same shell. A clinic or a classroom needs only a different partition set and a wider door. Folded, the body moves between plots. The z type folding container house asks for a level pad to stand on and a live power point to plug the lead into.

ワークショップの生産フロー

工場紹介

Expandable House Manufacturing Factory

当社は、プレハブ式コンテナハウス、拡張式コンテナハウス、折りたたみ式コンテナハウス、移動式プレハブ浴室を専門とするメーカーです。ホテル、別荘、オフィス、寮、倉庫、作業場、建設現場向けのモジュール式住宅ソリューションを設計、製造、輸出しています。工場は広州市にあり、敷地面積は5万平方メートルです。ご見学を歓迎いたします。

よくある質問

  • Is it quick to put up?

    A z type folding container house is built for easy install. Walls swing up by hand on hinges and pin at the corners, and a small crew closes the shell quickly.
  • What is the frame material?

    The frame is galvanized steel, welded square to hold its shape when the walls are up and the roof is on.
  • Can I order more than one at once?

    Yes, it is offered wholesale. Packs stack flat, and a single sea container carries several units, cutting the freight per unit.
  • What is included in the fit out?

    Lights, sockets, a breaker box and the door and window set ship fitted. Wiring is tested before the pack leaves the plant.
  • What do buyers put these in?

    Site offices, worker housing, guard cabins and small shops. The same shell works for a clinic with a different partition set.

ダウンロード

WhatsApp

伝言を残す!

伝言を残す!